07-12-2001 - Went to pick the truck up
07-14-2001 - Installed rear canvas
07-14-2001 - Started to apply stars and numbers
07-16-2001 - Fabricated and installed antenna mounts and antennas
08-06-2001 - Got the .50 Cal. from Steve Workman.
10-06-2001 - Got the gun ring and installed it.
10-09-2001 - Got the Power Steering kit (still under the seat).
10-14-2001 - Installed two new tires on front axles.
11-02-2001 - Changed Gear oil in all axles.
11-03-2001 - Replaced left front boot and seals.
11-03-2001 - Changed oil in Transfer case.
11-07-2001 - Got an M105A2 trailer, towed it home.
11-20-2001 - Replaced front left boot and seals AGAIN.
12-26-2001 - Replaced a leaking head gasket.
01-19-2002 - Installed Locking hubs on the front axle.
01-26-2002 - Changed oil in gear box.
02-12-2002 - Figured out and installed the Pioneer tool kit.
02-17-2002 - Installed end curtains.